PENN WESTERN RAILROAD PROJECTS FOR 2012 |
| A new yard for the Reading Subdivision. Progress as of 1/23/12 The two rightmost tracks are the old existing main line from Philly to Harrisburg. As a footnote, I like use HO cork roadbed that is widened to S scale by adding a 3/8" strip of cork roadbed in the middle. |


| EAST BROAD TOP EXTENSION TO MT. UNION (Sn3) Mt Union will feature hand laid dual-gauge track, the Timber Transfer crane and the transfer shed. The extension will complete a 60 foot point to point version of the EBT in Sn3. |
| OPERATIONS After many false starts, 2012 will see a serious effort to implement operations on the PWRR. Progress can be checked by clicking on the following set of buttons. Note especially the Card Car and Waybill creation. Anyone accessing the website can follow the instructions and create their own car cards and waybills. |


| OTHER ON-GOING PROJECTS 1- CATENARY FROM PHILADELPHIA TO HARRISBURG 2- INTERIOR AND EXTERIOR LIGHTING FOR STRUCTURES 3- ADDITIONAL STRUCTURES FOR THE EAST BROAD TOP AT ORBISONIA AND MT. UNION |



| AN AMERICAN FLYER OPERATING ACCESSORY HAS BEEN ADAPTED TO THE PENN WESTERN |
